BERGÉ embarks on its first international wind tower project with HAIZEA WIND

11 / Sep / 2018 | News

BERGÉ has been the company chosen to manage the first international shipment of wind towers made by the Basque manufacturer HAIZEA WIND, from the port of Bilbao.

Early on Friday morning, 31 August, BERGÉ put its machinery into action, loading the first instalments of HAIZEA WIND wind towers on the ship MV Nomadic Hjellestad, destined for the Port of Gavle (Sweden).

HAIZEA WIND have manufactured these wind towers for their clients in their facilities in Bilbao. Here, they have direct access to the loading bay, ensuring the most competitive logistics for incoming and outgoing materials.

This development marks the beginning of a relationship between two influential companies in the Basque Country, HAIZEA WIND, stand out company in the manufacturing of wind towers and offshore foundations, and BERGÉ, main logistics operator of bulk cargo in the port of Bilbao.

HAIZEA WIND GROUP began its activity last May, but has already become one of the leading companies in wind power manufacturing in Spain and worldwide.

BERGÉ, is the stand out operator in multimodal logistics services, able to handle the complete logistics chain and ship goods from their origin to wherever its clients require. With 150 years’ experience, BERGÉ is specialist in unloading and loading services and shipping of special parts. It has 60 cranes at its disposal in ports and specific terminals for wind power operations (blades, towers, turbines), transformers, industrial boilers, electrical power equipment, railway equipment, deposits and tanks, and a wide range of industrial machines and equipment.